LabCoat
TIME TO VALUE

From SOP Ingestion to Production Go-Live in 4 Weeks

Cleanroom operations cannot afford multi-month deployment freezes. LabCoat’s turn-key rollout framework delivers rapid onboarding, automated validation, and zero production downtime.

ZERO DOWNTIME

Parallel Shadow Run

Operators test LabCoat alongside existing paper records during non-critical runs, eliminating cutover risk before full sign-off.

CLEANROOM SANITIZATION

ISO 5 / Grade A Grade

Hardware conforms to rigorous 70% IPA chemical wipe-down and UV-C sterilization routines without fogging or lens degradation.

OPERATOR ADOPTION

1-Shift Training Curve

Because LabCoat projects contextual guidance directly into the sightline, technicians master the system in under 4 hours.

Phased Implementation

The 4-Week Rollout Blueprint

A structured, low-risk roadmap managed collaboratively between your QA/Operations teams and LabCoat Solutions Engineers.

WEEK 01
Facility & SOP Ingestion
Scoping & Mapping

Digital twin mapping and Master Batch Record (MBR) digitization.

  • Spatial scan of biosafety cabinets, incubators, cold storage, and gowning airlocks.
  • Ingestion of core Standard Operating Procedures into structured, step-by-step guidance models.
  • Asset tag generation and QR pairing for all target instruments and reagent shelving.
WEEK 02
Hardware & Edge Gateway
Infrastructure Setup

Fleet staging, local edge hub installation, and LIMS connector configuration.

  • Provisioning of wearable AR smart glasses with custom prescription lens inserts as needed.
  • Deployment of the on-premises or private VPC Edge Gateway and offline PGlite synchronization nodes.
  • Configuration of SSO / SAML 2.0 and bidirectional API webhooks with your LIMS/ELN instance.
WEEK 03
GAMP 5 IQ/OQ Execution
QA Qualification

Formal validation package execution alongside your Quality Assurance department.

  • Installation Qualification (IQ) scripts executed to verify hardware, encryption, and system boundaries.
  • Operational Qualification (OQ) tests executed for 21 CFR Part 11 e-signatures and tamper-evident audit trails.
  • QA sign-off on the Requirements Traceability Matrix (RTM) and system risk assessments.
WEEK 04
Operator Training & Go-Live
Production Cutover

Technician certification, parallel shadow runs, and official commercial batch cutover.

  • Hands-on training session (under 4 hours per technician shift) covering voice and wristband controls.
  • First live batch execution under LabCoat guidance with dedicated on-site support engineers.
  • Official transition to 100% paperless, contemporaneous batch records.
Sterility Assurance

Engineered for ISO Cleanroom Sanitization

Life sciences cleanrooms require non-negotiable sterilization protocols. LabCoat hardware and docking bays are purpose-built to survive sterile wipe-downs and gowning routines.

  • ✓
    70% IPA & Sporicidal Wipe Resistance: Smooth, non-porous frame coatings tested against sterile isopropyl alcohol and hydrogen peroxide wipes.
  • ✓
    Anti-Fog Optical Coating: Specialty hydrophobic coatings prevent condensation during breathing mask exhaust in biosafety containment hoods.
  • ✓
    Hot-Swappable Charging Docks: Magnetic UV-C sanitizing docking stations ensure that devices recharge and sterilize between technician shifts.
CLEANROOM COMPLIANCE CERTIFICATIONS
ISO 14644-1
Class 5 through Class 8 airborne particulate rating
EU GMP Annex 1
Grade A/B laminar flow and Grade C/D background suites
IP65 Rating
Hermetically sealed against cleanroom sanitizing aerosols
Battery Autonomy
8-hour shift capacity with rapid 30-min magnetic recharge

Ready to Plan Your Cleanroom Pilot?

Schedule an exploratory scoping session with our Solutions Engineering team. We will review your SOPs, facility layout, and draft a tailored 4-week rollout timeline.